Table 5.

Evaluation of carbon emissions from procurement and haulage.

Stage II Process Vehicle Capacity (t/L) No. of Loadings Total Fuel
(L)
ECF
(Fuel Based Equipment)
Embodied Carbon (t)
CO2e/t
Excavation and Procurement Clay procurement Pickup excavator 10 275 275 3.25 893.75
GS procurement Pickup excavator 10 118 118 3.25 383.5
CLS Pickup excavator 10 2 2 3.25 6.5
Total CO2 1283.75
Haulage Process Vehicle Capacity (t/L) Distance
(km)
Trips Total fuel
(L)
Embodied carbon
CO2e/t (t)
Haulage Clay Heavy-duty dumper 25 1 55 55 3.25 178.75
Granite sand Heavy-duty dumper 25 1 24 23.58 3.25 76.635
Calcium lignosulfonate Heavy-duty dumper 25 1 0.4 0.4 3.25 1.277
Total CO2 256.66
Total CO2(t) emissions in Stage II = 1540.4