Skip to main content
. 2023 Apr 13;13:6091. doi: 10.1038/s41598-023-33312-x

Table 2.

Mixing condition for cement pastes and mortars.

Mix. no Paste Mortar
First stage Second stage First stage Second stage
Time (min) Speed Time (min) Speed Time (min) Speed Time (min) Speed (rpm)
1 0.5 140 1.5 140 1 140 1 140
2 0.5 140 1.5 285 1 140 1 285
3 0.5 140 14.5 140 1 140 14 140
4 0.5 140 14.5 285 1 140 14 285
5 0.5 140 59.5 140 1 140 59 140
6 0.5 140 59.5 285 1 140 59 285
7* 0.5 140 89.5 140 1 140 89 140
8* 0.5 140 89.5 285 1 140 89 285

* for some tests.