Skip to main content
. 2023 May 3;13:7173. doi: 10.1038/s41598-023-34294-6

Table 15.

Confusion matrix for error analysis for CAD tag time predictions.

pred:Other pred:after DCT pred:before DCT pred:during DCT
true:Other 20,455 81 38 68
true:after DCT 6 6 56 0
true:before DCT 193 169 199 39
true:during DCT 34 14 36 19