Skip to main content
. 2023 May 24;13:8361. doi: 10.1038/s41598-023-35254-w

Table 6.

Results of static settlement limit of 9.52% concentration slurry.

Sedimentation time (s) Height of boundary between overflow water and tail mortar (mL) Tailing slurry concentration (%)
10 750 12.45
20 530 17.07
30 330 25.75
40 260 31.33
50 235 33.96
60 220 35.76
120 175 42.52
180 155 46.42
240 150 47.51
300 145 48.65