Skip to main content
. 2023 May 12;16(5):735. doi: 10.3390/ph16050735

Figure 7.

Figure 7

Actual vs. predicted activities for the training (blue squares) and test (red triangles) set compounds obtained from the field-based QSAR. The residual line limits of ±0.35 are shown by dotted-dash lines.