Skip to main content
. 2023 Jun 4;120:102909. doi: 10.1016/j.omega.2023.102909

Table 3.

Notations of the proposed multi-period PISP model.

Notation Description
Sets & Indices
m,mM Set of nodes, including manufacturers and hospitals in all regions
K & H Set of manufacturers and hospitals in all regions
Ki(m) Subsets of manufacturers in region i; K=iKi(m)
Hi(m) Subsets of hospitals in region i; H=iHi(m)
jJ set of suppliers of raw materials
pP Set of medical products, including two sets of consumable P (hydro-alcoholic gel, mask, medical clothes, and ordinary beds) and reusable P (ICU beds and ventilator)
tT Set of time periods
Parameters
L Lead-time periods as the occupancy time, at which the reusable products are reconsidered as available inventory
γp Conversion rate of raw materials to manufacture product p
Dpmt Demand for product p in hospital m at period t
Upj Capacity limitation for product p at supplier j
Qpm Capacity limitation for product p at manufacturer m
OCj Ordering cost of product p at supplier j
SCpm Production cost of product p at manufacturer m
PCpm Unit production cost of product p at manufacturer m
TCpjm Transportation cost per unit of product p from supplier j to manufacturer m
CU Unit cost of unmet demand at hospitals
Ipm0 Initial inventory of product p at manufacturer/hospital m at the beginning of the planning horizon
ICpm Unit inventory holding cost of product p at manufacturer/hospital m
Ipmmax Maximum inventory capacity for product p at manufacturer/hospital m
Gpmmax Maximum sharing capacity for product p at hospital m
TQp Total sharing capacity for product p over all regions
μp Allowed demand surplus (%) for product p at hospitals that can be met through the sharing system
TCpmm Unit transportation cost of product p shared among hospitals m and m during the sharing process
Decision variables
wjt 1 if an order is placed to supplier j at period t; 0 otherwise
ypmt 1 if product p is set up for production in manufacturer m at period t
bpmt Net service balance of product p in hospital m at the beginning of period t before transferring the products in the sharing process; bpmt=bpmt++bpmt, where bpmt+ and bpmt are positive and negative parts of net service balance bpmt (i.e., bpmt+=max{0,bpmt} and bpmt = min{0,bpmt})
vm 1 if bpmt>0; 0 otherwise
xpmt Production quantity of product p in manufacturer m in period t
upjmt Quantity of raw material for product p transferred from supplier j to manufacturer m in period t
qmmpt Quantity of product p transferred from manufacturer m to hospital m at the beginning of period t
Ipmt Inventory of product p in node m at the end of period t
gpmt Available quantity of product p to be supplied by hospital m in period t to satisfy its internal demand and external sharing
smmpt Quantity of product p shared from hospital m to hospital m in period t; smmpt=0 and smmpt=smmpt, where (smmpt)+ and (smmpt) are the positive and negative parts of shared products (i.e., (smmpt)+=max{0,smmpt} and (smmpt)=min{0,smmpt} for mm)
Spmt Amount of unmet demand of product p in hospital m at the end of period t
Smax Maximum unmet demand among all hospitals