Skip to main content
. 2023 May 17;23(2):1–139.

Table A21:

Detailed Budget Impact Analysis Results—Reference Case

Budget impact, $ milliona
Year 1 Year 2 Year 3 Year 4 Year 5 Totalb
Current scenario
Total RSL 0.45 0.48 0.55 0.59 0.63 2.70
    RSL labour 0.22 0.23 0.27 0.29 0.30 1.31
    RSL material 0.23 0.25 0.29 0.30 0.32 1.40
Total WGL 1.36 1.36 1.35 1.35 1.35 6.76
    WGL labour 0.92 0.92 0.91 0.91 0.91 4.59
    WGL material 0.44 0.44 0.43 0.43 0.43 2.17
New scenario
Total RSL 0.39 0.33 0.31 0.25 0.19 1.47
    RSL labour 0.19 0.16 0.15 0.12 0.09 0.71
    RSL material 0.2 0.17 0.16 0.13 0.1 0.76
Total WGL 1.2 1.05 0.89 0.73 0.57 4.44
    WGL labour 0.81 0.72 0.6 0.5 0.39 3.02
    WGL material 0.38 0.34 0.28 0.23 0.18 1.42
Total WFNRL 0.73 1.47 2.24 3.02 3.82 11.28
   WFNRL labour 0.12 0.25 0.37 0.51 0.64 1.89
   WFNRL material 0.61 1.23 1.86 2.51 3.18 9.39
Budget impactb
Total cost difference 0.51 1.01 1.53 2.06 2.61 7.73
    Cost difference, labour -0.02 -0.04 -0.06 -0.08 -0.1 -0.28
    Cost difference, material 0.52 1.05 1.59 2.14 2.71 8.01

Abbreviations: RSL, radioactive seed Localization; WGL, wire-guided localization; WFNRL: wire-free, nonradioactive localization.

a

In 2022 Canadian dollars.

b

Results may appear inexact due to rounding.