Table 6.
The VAR estimation results.
OPVt | GDPt | NRt | REt | CO2t | GFt | |
---|---|---|---|---|---|---|
constant | 0.0460** | −0.0147 | 0.0294** | 0.0501* | −0.0138** | 0.0331** |
[3.15] | [-1.55] | [3.27] | [1.83] | [-3.39] | [3.18] | |
ORt-1 | −0.0587*** | −0.0031 | −0.0048 | −0.0431*** | −0.0050 | −0.0039 |
[-4.97] | [-0.47] | [-0.72] | [-4.17] | [-1.41] | [-0.61] | |
ORt-2 | −0.0131 | −0.0043 | −0.0083 | −0.0141 | −0.0019 | −0.0071 |
[-0.70] | [-0.74] | [-1.12] | [-1.04] | [-0.83] | [-1.01] | |
ERt-1 | −0.0957*** | −0.0948*** | −0.0572*** | −0.0231 | 0.0035 | 0.0812*** |
[-4.21] | [-5.65] | [-3.98] | [-0.66] | [0.40] | [3.49] | |
ERt-2 | −0.0631* | −0.0355** | −0.0368* | −0.0439 | 0.0061 | −0.0141 |
[-1.88] | [-3.19] | [-1.80] | [-1.50] | [0.49] | [-0.80] | |
GRt-1 | 0.0131 | 0.0033 | −0.0341** | −0.0021 | −0.0111** | −0.0550*** |
[0.50] | [0.44] | [-3.35] | [-0.07] | [-3.04] | [-3.39] | |
GRt-2 | 0.0390 | 0.0067 | −0.0034 | 0.0304 | −0.0049 | −0.0039 |
[1.63] | [0.64] | [-0.24] | [1.63] | [-1.05] | [-0.29] |