Summary on energy resources and their LCOE of different projects in WA countries
| Project location | System configuration | LCOE ($/kWh) | Reference |
|---|---|---|---|
| Ekwe, Nigeria | PV/wind/diesel/battery | 0.11 | Oladigbolu et al. [78] |
| Upper West Region, Ghana | PV/Biodiesel | 0.76 | Adaramola et al. [79] |
| Pissila, Burkina Faso | Hybrid PV/Diesel | 0.5 | Ouedraogo et al. [80] |
| Mankwadze, Ghana | PV/Wind/Diesel/battery | 0.39 | Agyekum & Nutakor [75] |
| Ondo state, Nigeria | Wind/PV/Diesel | 0.58–0.68 | Adaramola, M [81]. |
| Fouay, Benin | PV/Diesel/Battery | 0.21 | Odou et al. [77] |
| Ala-Ajagbusi, Nigeria | Wind/diesel/battery | 0.37 | Ayodele, T [82]. |
| Kaduna state, Nigeria | PV/Diesel/battery | 0.49 | Sofimieari et al. [83] |
| Coastline communities, Nigeria | PV/Wind/Diesel | 0.79 | Diemuodeke et al. [84] |