Table 1.

Comparative analysis of criteria and indicators of multi-criteria models.

MODEL I The Conversion meter model
Phase I – Quick Scan: an initial appraisal of unoccupied offices using veto criteria
veto criteria indicators
market There is a demand for housing for local target groups;
stakeholders Presence of influential project initiator;
Meets criteria for the region, location, and accessibility;
Meets criteria regarding size and character of the building;
Willingness to sell the building;
Willingness to buy and transform the building;
The positive attitude of the municipality;
location The zoning plan permits modification;
No serious public health risk (pollution, noise …);
building Free ceiling height >2.60 m;
Phase II – Feasibility scan: a further appraisal
criteria sub-criteria indicators
location functional Urban location Building in a suitable area;
Good daylight/sunlight exposure;
Good view from >75% of floor space of a building;
Distance and quality of facilities Shop for daily necessities <500 m;
Neighborhood meeting places (square, park) <500 m;
Food service industry <500 m;
Bank/post office <5 km;
Basic medical facilities <2 km;
Sports facilities <2 km;
Educational facilities <2 km;
Accessibility by public transport Distance to railway station <2 km;
Distance to bus, tram, underground <1 km;
Accessibility by car Good flow, normal street quality;
Distance to parking sites <250 m;
>1 parking lot per 100 m2 of office space;
cultural Representative impression Situated centrally (not near highway locations);
Other buildings present in the direct neighborhood;
Lively neighborhood;
Direct availability of green environment;
Area has a good reputation/no vandalism;
Area has good air quality and low pollution and noise;
legal Urban location Noise load on facade <50 dB (max for office building is 60 dB);
Ownership of location Land in property or with a short lease;
building functional Year of construction or renovation Building >3 years;
Renovation >3 years;
Vacancy Complete building is vacant;
Building vacant >3 years;
New housing Building capacity >20 units/50 m2;
Lay-outs adaptable for local target groups;
Extendibility Horizontal building extension possible;
Vertical building extension possible;
Possibilities for constructing the basement;
cultural Representative impression Identifiable compared to surrounding buildings;
Own identity recognizable;
Cultural heritage Not a cultural heritage; simplifies process;
Access (entrance, elevators, stairs) Clean, safe and clear building entrance;
technical Condition of maintenance Well maintained; maintenance up-to-date;
Dimensions of support structure Depth of building <10 m;
Grid support structure >3.60 m;
Height dimension between floors < 6 m;
Support structure Condition support structure is good
Possible connection inner walls on grid <5.40 m
Facade Facade/openings well adaptable
Facade windows can be reused/opened
Installations Sufficient service ducts can be constructed;
legal Environment Absence of large amount of hazardous materials in the building;
Acoustic insulation of floors >5 dB;
Good thermal insulation of facades and roof;
Sufficient daylight factor >90% floor surface for new units;
National Building Decree, escape and access routes Elevators available/easy to install in building >4 stories high;
(Emergency) stairways available/realizable;
Distance of new units to stairs/elevators <50 m;

MODEL II The TOBUS model
criteria sub-criteria indicators
Physical state of degradation of building elements Building elements objects types
aroof (e.g.) roof covering (e.g.) (for objects “roof covering”) tiles
(for objects “roof covering”) roofing membrane
Functional obsolescence of building service User needs Compliance with user’s professional activities in office spaces;
Flexibility Capacity to easily modify the interior space partitioning and general office layout without any major intervention in building installations and structure;
Divisibility Capacity to divide the buildings into separate and independent zones;
Maintainability Capacity to facilitate easy maintenance of the premises;
Compliance with regulations The capacity of the various installations to comply with national regulations;
Energy consumption Heating Calculations for heating energy balance and savings from retrofit actions (heating systems);
Cooling and ventilation Calculations for cooling energy balance and savings from retrofit actions (passive and hybrid cooling techniques – ceiling fans, night ventilation..; controls in air handling units, …);
Heat for service hot water Calculations for savings from retrofit actions (instantaneous water heaters, ice and chilled water storage);
Lighting Calculations for saving from the use of energy-efficient lamps/luminaires and daylight assessment;
Equipment Calculations for energy consumption and savings for office equipment (low energy office equipment);
Electromechanical installations Service quality and energy consumption of existing lifts (zoning of elevators and service quality);
Water use Water conservation for sanitary services (sanitary water savings);
bIndoor environment quality Thermal comfort Draught (e.g.)
Temperature balance (e.g.)
Temperature changes (e.g.)
Floors (e.g.)
Surfaces (e.g.)
Control of temperature (e.g.)
Indoor air quality (humidity, pollutants, ventilation) Air (e.g.)
Smells (e.g.)
Static electricity (e.g.)
Control of ventilation (e.g.)
Lighting The intensity of light (e.g.)
Sufficiency of light (e.g.)
Level of glare (e.g.)
View (e.g.)
Control of light (e.g.)
Noise Level of noise (e.g.)

MODEL III The ARP model
criteria sub-criteria indicators
Expected physical life (in years) Environmental context Distance from the coast <1 km;
Stable soil conditions;
Level of rainfall;
“Greenfield” site;
Exposure to potential flood or wash-away conditions;
Exposure to severe storm activity;
Exposure to earthquake damage;
Bushfire zone;
Area of civil interest;
Presence of animals or insects that can damage the building fabric;
Occupational profile Main use during normal working hours;
Industrial-type activities are undertaken within the building;
Availability to the general public;
Presence of tenant occupancy;
Presence of building manager or caretaker;
Long-term asset;
Hazardous material storage or handling;
Occupation density >1 person per 10 m2;
Protection by security surveillance;
Insurance;
Structural integrity Massive construction;
The main structure over-designed;
Complex or unconventional building structure;
Highly durable building components;
Presence of other structures immediately adjacent to the building;
Foundation on solid rock;
Workmanship standard;
Possibility of roof leaking in bad weather conditions;
Protection against accidental fire events;
Public monument or landmark;
Physical life Building age (in years) Current building age;
Obsolescence Physical Level of maintenance;
Economic Building location/distance from other facilities;
Functional Level of flexibility/adaptability;
Technological Energy consumption - required energy to achieve comfort for the users;
Social The position of the use of the building within the market demand;
Legal The quality of the original design;
Political The level of interest of the public and the local community in the building;

MODEL IV The iconCUR model
criteria sub-criteria indicators
Condition Structure Design standard;
Maintained service level;
Regulatory compliance;
Exterior envelope Design standard;
Maintained service level;
Regulatory compliance;
Interior finishes Design standard;
Maintained service level;
Regulatory compliance;
Engineering services Design standard;
Maintained service level;
Regulatory compliance;
External works Design standard;
Maintained service level;
Regulatory compliance;
Utilization Internal space Demand or relevance;
Fitness for purpose;
User satisfaction;
External space Demand or relevance;
Fitness for purpose;
User satisfaction;
Outdoor site area Demand or relevance;
Fitness for purpose;
User satisfaction;
Equipment and fit out Demand or relevance;
Fitness for purpose;
User satisfaction;
Engineering systems Demand or relevance;
Fitness for purpose;
User satisfaction;
Collective utility Operational viability Economic performance;
Culture and heritage;
Environmental values;
Locational contact Economic performance;
Culture and heritage;
Environmental values;
Risk and opportunity Economic performance;
Culture and heritage;
Environmental values;
Asset valuation Economic performance;
Culture and heritage;
Environmental values;
Profile/mission Economic performance;
Culture and heritage;
Environmental values;
Stakeholder interest Building owner Short-term perspective;
Medium-term perspective;
Long-term perspective;
Building user Short-term perspective;
Medium-term perspective;
Long-term perspective;
Facility manager Short-term perspective;
Medium-term perspective;
Long-term perspective;
Sponsor/financier Short-term perspective;
Medium-term perspective;
Long-term perspective;
Community Short-term perspective;
Medium-term perspective;
Long-term perspective;

MODEL V The PAAM model
criteria indicators
Physical and size Number of storeys;
Gross floor area;
Property Council of Australia building quality grade;
Degree of attachment to other buildings;
Typical floor area;
Site access;
Land Street frontage;
Vertical services location;
Property location;
Social factor Historic listing;
Age in 2010;
Aesthetics;
a

Only examples of sub-criteria and indicators are presented for this criterion due to many possible different combinations of building elements which improvement required consideration.

b

Only examples of indicators are presented for this criterion, due to the fact that indicators is based on checklists and questionnaire with many items.