Design and results of Box–Behnken.
| Run | A | B | C | Conversion/% | Selectivity/% | BHET yield/% | Residual (%) | |
|---|---|---|---|---|---|---|---|---|
| Actual | Predicted | |||||||
| 1 | 0 | 0 | 0 | 100 | 85.60 | 85.60 | 85.20 | 0.40 |
| 2 | 0 | 0 | 0 | 100 | 85.60 | 85.60 | 85.20 | 0.40 |
| 3 | 0 | 0 | 0 | 100 | 85.60 | 85.60 | 85.20 | 0.40 |
| 4 | −1 | −1 | 0 | 100 | 73.00 | 73.00 | 75.45 | −2.45 |
| 5 | −1 | 0 | 1 | 100 | 89.40 | 89.40 | 87.05 | 2.35 |
| 6 | 1 | 1 | 0 | 100 | 85.40 | 85.40 | 82.95 | 2.45 |
| 7 | 0 | 0 | 0 | 100 | 85.60 | 85.60 | 85.20 | 0.40 |
| 8 | −1 | 0 | −1 | 100 | 75.40 | 75.40 | 72.95 | 2.45 |
| 9 | −1 | 1 | 0 | 100 | 86.00 | 86.00 | 88.35 | −2.35 |
| 10 | 0 | −1 | −1 | 100 | 69.40 | 69.40 | 69.40 | 0.00 |
| 11 | 0 | −1 | 1 | 100 | 79.10 | 79.10 | 79.00 | 0.10 |
| 12 | 1 | 0 | −1 | 100 | 77.20 | 77.20 | 79.55 | −2.35 |
| 13 | 0 | 0 | 0 | 100 | 83.60 | 83.60 | 85.20 | −1.60 |
| 14 | 1 | −1 | 0 | 100 | 74.60 | 74.60 | 72.25 | 2.35 |
| 15 | 0 | 1 | 1 | 100 | 84.40 | 84.40 | 84.40 | 0.00 |
| 16 | 0 | 1 | −1 | 100 | 87.50 | 87.50 | 87.60 | −0.10 |
| 17 | 1 | 0 | 1 | 100 | 69.40 | 69.40 | 71.85 | −2.45 |