Skip to main content
. 2022 Nov 17;56(8):1189–1223. doi: 10.1177/00104140221139513

Table 3.

Probit, Poisson, and IV-LPM Models of Pressure on the Central Bank.

(1) (2) (3) (4) (5) (6) (7) (8)
Degree of populism 0.785** 0.863*** 0.873*** 0.738** 0.724** 1.037** 0.065 0.638***
(0.304) (0.262) (0.263) (0.245) (0.250) (0.321) (0.034) (0.140)
Economic left-right scale −0.259*** −0.263*** −0.276* −0.015 −0.019
(0.071) (0.071) (0.110) (0.010) (0.104)
Populism × economic left-right scale 0.490** 0.470** 0.526 0.025 0.015
(0.172) (0.173) (0.291) (0.019) (0.276)
Lagged capital outflows to GDP −0.001* −0.001** −0.000 −0.002*
(0.000) (0.000) (0.000) (0.001)
Democracy −0.064 −0.060 −0.059 −0.062 −0.079 0.002 −0.027
(0.043) (0.047) (0.044) (0.045) (0.086) (0.005) (0.078)
Less than 12 months to election −0.231 −0.229 −0.234 −0.212 −0.330 −0.019 −0.239
(0.174) (0.172) (0.166) (0.168) (0.299) (0.013) (0.198)
IMF CB conditions −0.471 −0.495 −0.527 −0.541 −0.695 −0.028 −0.341
(0.421) (0.424) (0.450) (0.452) (0.699) (0.025) (0.245)
Debt-to-GDP ratio −0.004 −0.006 −0.004 −0.014 0.001 −0.049
(0.011) (0.011) (0.010) (0.022) (0.001) (0.031)
Lagged inflation 0.013 0.014 0.005 −0.047 −0.011 0.096
(0.066) (0.066) (0.066) (0.080) (0.007) (0.088)
Lagged Δ exchange rate 1.391 1.185 0.246 0.365 −0.333 5.729
(4.400) (4.519) (4.690) (7.772) (0.493) (5.516)
Lagged Δ GDP 2.837 2.753 3.551 4.753 0.355 5.509
(3.574) (3.623) (3.328) (6.440) (0.288) (7.764)
t −0.178*** −0.181*** −0.181*** −0.180*** −0.181*** −0.344*** −0.020*** −0.170**
(0.021) (0.022) (0.023) (0.022) (0.022) (0.058) (0.004) (0.054)
t 2 0.004*** 0.005*** 0.004*** 0.004*** 0.004*** 0.009*** 0.000*** 0.004
(0.001) (0.001) (0.001) (0.001) (0.001) (0.002) (0.000) (0.003)
t 3 −0.000*** −0.000*** −0.000*** −0.000*** −0.000*** −0.000** −0.000*** −0.000
(0.000) (0.000) (0.000) (0.000) (0.000) (0.000) (0.000) (0.000)
Prob > F 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Pseudo-R2 0.315 0.328 0.330 0.338 0.345 0.339 0.356
Chi-square 181 270 380 509 549 713 19837
Log-likelihood −217 −213 −212 −210 −207 −265 −89
N 2000 2000 2000 2000 2000 2000 2000 415
Number of clusters 35 35 35 35 35 35 35 17

Huber-White standard errors clustered by country. First stage of the instrumental variable model is shown in the online appendix.

*p < 0.05,**p < 0.01,***p < 0.001.