Fig. 4.

Block diagram of A-SEE-RUSS. Blue arrows represent data transmission pipelines that are built under Robot Operating System (ROS) framework. White tubes represent rigid mechanical connections.

Block diagram of A-SEE-RUSS. Blue arrows represent data transmission pipelines that are built under Robot Operating System (ROS) framework. White tubes represent rigid mechanical connections.