Cost estimated per sampling scheme, per person night of sampling over fifteen months by both CBC and experienced parallel surveillance QA teams

Estimated parameter Description Number of units for CBCs Number of units for supervised collections Cost/Unit (KES) CBCs $(KES) QA teams $(KES)
Personnel costs Entomology technician 1 for 15 months 2 for 15 months 175,000 26,250 (2,625,000) 52,500 (5,250,000)
Driver 1 for 15 months 1 for 15 months 75,000 1,125 (112,5,00) 11,250 (1,125,000)
Casual workers 4 for 15 months 5,000 3,000 (300,000)
CBCs 8 for 15 months 10,000 12,000 (1,200,000)
Per diem costs Entomology technician 2 for 15 months 35,000 10,500 (1,050,000)
Driver 1 for 15 months 21,000 3,150 (315,000)
Equipment cost Solar charging system 8 systems 58,074 4645.9 (464,592)
Light traps 24 20 11,200 2,688 (268,800)
Light trap batteries 20 5,353 1,070.6 (107,060)
Tablets 8 2 13,000 1,040 (104,000) -260 (26,000)
Transport and vehicle maintenance costs Cost per kilometre 420 per month 660 km per month 75 4,725 (472,500) 7,425 (742,500)
Total expenditures 52,473.9 (5,247,390) 91,395.6 (9,139,560)
Number of sampling efforts 5735 1024
Cost per collection effort 9.1 (910) 89.3 (8,925.3)