Skip to main content
. 2022 Sep 15;49:141–150. doi: 10.1016/j.jare.2022.09.004

Fig. 1.

Fig. 1

Quality Control-Particle Detectionsystem during whole process from sampling to Raman spectrum measurement. Five points of possible contamination were inspected (1–5). The whole process control (6) were set for the whole operation with the bone nails as the operative subjects. The first four controls (1–4) were blank controls, the last two (5–6) were negative controls.