Skip to main content
. 2023 Jul 12;14:4148. doi: 10.1038/s41467-023-39832-4

Table 1.

Photovoltaic performance under simulated AM 1.5 G illumination

PM6:PY-IT JSC (mA cm−2) JCal (mA cm−2) VOC (V) FF (%) PCEa (%)
As-cast 24.12 (23.74 ± 0.18) 24.03 (23.79 ± 0.14) 0.933 (0.929 ± 0.003) 67.42 (66.26 ± 0.79) 15.17 (14.62 ± 0.28)
DIB 24.98 (24.41 ± 0.18) 24.87 (24.62 ± 0.13) 0.938 (0.937 ± 0.002) 72.39 (71.63 ± 0.85) 16.97 (16.42 ± 0.30)
DIB/TA/SVA 25.92 (25.38 ± 0.25) 25.48 (25.21 ± 0.14) 0.944 (0.941 ± 0.002) 74.88 (74.40 ± 0.49) 18.32 (17.76 ± 0.29)
DIB/SVA/TA 18.79 (18.08 ± 0.87) 18.82 (18.59 ± 0.17) 0.910 (0.905 ± 0.009) 59.64 (55.10 ± 2.86) 10.20 (9.03 ± 0.69)
DIB/TA/SVAb 26.37 (25.96 ± 0.20) 0.945 (0.940 ± 0.003) 76.48 (76.10 ± 0.48) 19.06 (18.56 ± 0.18)
Certified 26.26 0.945 74.95 18.59

aThe average values are obtained from repeatedly individual experimental results.

bThe device prepared with 2PACz as HTL.