Table 2.
Risk assessment plan for non-integrated POCT in analytical testing phase
| Risk Assessment Components | Possible sources of error | Risk Mitigation: Manage/Prevent Errors from Occurring |
|---|---|---|
| Testing Personnels’ Training and Competency | Not trained POCT user Not competent POCT user Improper training or expired competency records Proper POCT technique/ system maintenance /QC not being accurately followed |
|
| Test system- Calibration | Calibration omitted Calibration out and patient results reported There is no mechanism, such as an operator lockout, to ensure only trained personnel use the test system |
|
| Test system- Maintenance | Maintenance procedures not consistent with manufacturer’s instructions |
|
| Test system-Reagent | Expired reagents Wrong lot of reagents |
|
| Test system- QC | Expired QC Wrong lot of QC Unable to interpret QC Unable to trouble shoot if QC is out |
|
| Environment-room Temperature | Room temperature not appropriate |
|
| Environment- Storage conditions | Sample / reagents/ cartridge/ strips storage conditions not appropriate |
|