Skip to main content
. 2023 Jun 23;199(12):1324–1335. doi: 10.1093/rpd/ncad168

Table 2.

List of general parameters.

Symbol Name Value Unit
S Collective dose manSv
Sa Sum of collective dose per GW per year manSv GW−1 a−1
E Additional annual effective dose mSv
E* Weighted additional annual effective dose mSv
N Number of persons who were exposed
m Amount of material needed for 3 MW wind turbine kg
M Annual amount of produced material kg
P Installed power of the wind turbine 0.003 GW
Inline graphic Efficiency 0.24
Inline graphic Lifetime of the wind turbine 22.5 a