Skip to main content
. 2023 Jul 21;13:11786. doi: 10.1038/s41598-023-39025-5

Table 1.

The components of the model.

Components
Entity Raw oil
Resources Bascule, Inspectors, PX 60, SRG, SSG, Dryer, Discoloring storage, Operators of odorlessing section, Operators of partitioning section, Operators of hydrogenation section, Operators of filtering section, Operators of post bleach section, and Serak machine
Queues Bascule queue, Laboratory 1 queue, PX60 separator queue, SRG separator queue, SSG queue, Dryer queue, Discolor queue, Odorless queue, Partitioning queue, Hydrogenation queue, Serak machine queue, and Post bleach queue
Group Resources Inspectors, Operators of odorless section, Operators of partitioning section, Operators of hydrogenation, Operators of filtering section, and Operators of post bleach section
Transporters Oil tanker and Liftruck
Conveyers Conveyer
Processes Weighting, Laboratory test, PX60 separator, First washing, Second washing, Drying, Discoloring storages, Odorless, Packaging storages, Serak machine, Packaging, Hydrogenation, Filtering, Post bleach, Cold Storage, and Vacating
Scheduling Regarding to production line that works in three parts of 8 h of a day, scheduling should be done in every section that operators work. Operators who were scheduled are the current operators in group resources
Inputs Entrance of raw oil
Outputs Returning oil, Fatty acid storages, Soup storages, First of neutral line, Solid oil storages, and liquid oil storages
Variables Total oil in process and maximum of oil entrance