Skip to main content
. 2023 Jul 21;13:11786. doi: 10.1038/s41598-023-39025-5

Table 2.

Transaction time of resources.

Processes Number of operators in per shift Constant (min) Minimum (min) Maximum (min) Mod (min)
Entrance raw oil (quintuplet batch size) 300 420
Bascule 6 8
Laboratory test 1 1 3
Vacating oil in storages 35 210
PX60 separator 60 65
SRG separator 60 65
SSG separator 60 65
Dryer 3 4
Bleaching 20 30
Storages 1 1 1440 120
Odorlessing 1 and 2 1 240
Packaging storages 30 600
Serak machine 2 3
Packaging 1 6 0.5
Filtering 2 30 60
Post bleach 1 70 80
Storages 2 30 60
Packaging 2 6 10 60
Cold storage 720 900