Table 7.
Estimates of integrated scores from the Mallows-Binomial (MB) and Mean Ratings (MR) models. A small positive value is added to the integrated scores of proposals 22 and 6 in order to signify that and in the MB model. The order of proposals is based on the MB model
| Proposal | MB | MR | Proposal | MB | MR |
|---|---|---|---|---|---|
| 17 | 0.114 | 0.114 | 1 | 0.375 | 0.375 |
| 19 | 0.125 | 0.125 | 11 | 0.382 | 0.382 |
| 25 | 0.125 | 0.125 | 18 | 0.452 | 0.452 |
| 21 | 0.143 | 0.143 | 24 | 0.461 | 0.461 |
| 4 | 0.175 | 0.175 | 2 | 0.472 | 0.472 |
| 23 | 0.182 | 0.182 | 27 | 0.500 | 0.500 |
| 20 | 0.195 | 0.195 | 28 | 0.500 | 0.500 |
| 22 | 0.195 | 0.195 | 5 | 0.527 | 0.528 |
| 13 | 0.218 | 0.222 | 26 | 0.611 | 0.611 |
| 16 | 0.222 | 0.225 | 8 | 0.618 | 0.618 |
| 3 | 0.225 | 0.225 | 12 | 0.625 | 0.625 |
| 6 | 0.225 | 0.218 | 9 | 0.690 | 0.690 |
| 7 | 0.322 | 0.322 | 10 | 0.703 | 0.703 |
| 15 | 0.344 | 0.344 | 14 | 0.731 | 0.731 |