Skip to main content
. 2023 Jun 13;14(7):3294–3307. doi: 10.1364/BOE.486276

Fig. 6.

Fig. 6.

Qualitative comparison of our method with the U-Net under the data budgets of 10% (left) and 100% (right). The ground truth is labeled in green.