Skip to main content
. 2023 Jul 13;14:1128285. doi: 10.3389/fpsyg.2023.1128285

Table 5.

Summary of the questionnaire responses on the take-over perception asked after each TOR.

Question group HMI M SD p-values
G11—TOR urgency Baseline 2.73 0.73 pBC = 0.042
Red 3.16 0.79 pRB = 0.613
Blue 3.32 0.88 G12—TOR Stress Baseline 2.15 0.70 pBC = 0.036
Red 2.64 0.74 pRB = 0.829
Blue 2.70 0.71

Means and standard deviations were calculated for every HMI along with the corresponding p-values.