Skip to main content
. 2022 Nov 16;117(6):554–564. doi: 10.1080/20477724.2022.2146049

Table 3.

Time distribution by technicians as measured with Form #3.

Time distribution results
Activity/Held by Technician 1 Technician 2 Total hours Activity/Held by Technician 3
Manufacture of 40 ovitraps 1 h 1 h 2 h 1st Data transmission 8 h
Installation of 40 ovitraps 3 h 40 m 4 h 35 m 8 h 15 m 2nd Data transmission 4 h
1st Reinstallation 4 h 05 m 3 h 35 m 7 h 40 m 3rd Data transmission 2 h
2nd Reinstallation 3 h 45 m 3 h 30 m 7 h 15 m 4th Data transmission 2 h
3rd Reinstallation 4 h 08 m 3 h 45 m 7 h 53 m    
4th Reinstallation 3 h 40 m 3 h 20 m 7 h