Skip to main content
. 2023 Aug 3;13:12626. doi: 10.1038/s41598-023-39916-7

Figure 10.

Figure 10

3D FEA simulation result of the EDFs produced by non-insulated Hi-Mn steel rebars, Fdg, corresponding to various number of nodes at velocities of 200 km/h for full-scale Hyperloop including a 12 pole–6 module HTS magnet.