Skip to main content
. 2023 Jul 22;9(8):e18549. doi: 10.1016/j.heliyon.2023.e18549

Table 3.

Calculation results of explosion pressure at observation points 1 and 2 (different media).

Observation points Working condition First pressure peak
Second pressure peak
Time (μs) Value (MPa) Time (μs) Value (MPa)
1 Gas pipeline 9500 3.26 11,200 2.21
Oil pipeline 9700 2.86 11,500 2.16
2 Gas pipeline 16,100 0.12 17,800 0.16
Oil pipeline 11,600 0.06 14,800 0.12