Skip to main content
. 2023 Jul 26;16(15):5246. doi: 10.3390/ma16155246

Figure 11.

Figure 11

(a) LPBF process; (b) EBPBF process [59]. The down arrows in the figures represent the direction of movement of the build platform, while the up arrow represents the direction of motion of the dispenser.