Skip to main content
. 2023 Aug 14;13:13229. doi: 10.1038/s41598-023-40223-4

Table 2.

Details of Irrigation scheduling, planting techniques and moisture conservation measures followed in plant-ratoon-ratoon crop cycle (2013–2014, 2014–2015, 2015–2016).

Planting techniques Irrigation Scheduling treatments and moisture conservation measures
Full irrigation at recommended intervals with 100% crop ET replacement Deficit irrigation scheduling at recommended intervals with 75% crop ET replacement
150 × 45 cm (BSS) CCP @ 10 t/ha Sugarcane trash 5 t/ha Control CCP @ 10 t/ha Sugarcane trash 5 t/ha Control
150 × 60 cm (BCS) CCP @ 10 t/ha Sugarcane trash 5 t/ha Control CCP @ 10 t/ha Sugarcane trash 5 t/ha Control
90 cm (two budded setts) CCP @ 10 t/ha Sugarcane trash 5 t/ha Control CCP @ 10 t/ha Sugarcane trash 5 t/ha Control

ET evapotranspiration, BCS bud chip settling, CCP composted coir pith.