Table 3:
Control (n=33) | Intervention (n=27) | ||||
---|---|---|---|---|---|
Mean Proportion of Errors | Standard Deviation | Mean Proportion of Errors | Standard Deviation | p-value | |
All Errors | 19% | ±8 | 20% | ±9 | 0.807 |
Serious Errors (11 or 12 possible) | 25% | ±16 | 28% | ±17 | 0.477 |
Installation | 21% | ±13 | 23% | ±15 | 0.549 |
Errors (19 or 20 possible) | |||||
Infant Positioning Errors (5 possible) | 40% | ±20 | 36% | ±22 | 0.514 |