Skip to main content
. 2023 Aug 16;9:e1522. doi: 10.7717/peerj-cs.1522

Table 2. Regression fitting schedule time (s).

Regression
method
Time/cor
=0.2
Time/cor =0.4 Time/cor =0.6 Time/cor =0.8 Time/cor =0.98
Elastic-Net 0.334 0.328 0.358 0.396 0.502
Lasso 0.286 0.285 0.293 0.293 0.345
SCAD 0.135 0.141 0.154 0.156 0.201
Adaptive-Lasso 0.308 0.312 0.362 0.338 0.410