Table 3.

Production scheduling plan information.

Number of iterations Component processing sequence Number of molds Storage cost (yuan) Completion time (D)
M1 M2 M3
1 TRGQVHBMUJIDPSCNFWOXEKAL 1 2 2 11,579 9
20 NGDTOSAIMHWRPJFKEULXQCVB 1 2 2 8120 7
80 POAHTECSUJRMBGNIFQKVWXLD 1 2 2 7483.5 7
160 HPCAIROTULEBSMVWFQNGKDXJ 1 2 2 6696 6
190 SIARKPTHEOGNMUVCXDFJBQLW 1 2 2 6237 5