Skip to main content
. 2023 Aug 30;11:1186525. doi: 10.3389/fpubh.2023.1186525

Figure 2.

Figure 2

PMMoV Seasonal Trend Loess (STL) decomposition plots for the Warden (A), Humber AMF (B), and Kitchener (C) wastewater sampling sites. The frequency was set as 1 week and the trend length was 3 months.