Skip to main content
. 2023 Sep 14;10:625. doi: 10.1038/s41597-023-02412-8

Fig. 9.

Fig. 9

Flowchart of the overall process devoted to the probabilistic hazard assessment. Red asterisk indicates the present research positioning.