Table 8.

Testing the load carrying capacity for Leading The Way scenario when the charging infrastructure is designed for the year 2042 with EV quantity 134,606

Case Normal Extreme Percentage of change
Number of EVs 134,606 300,000 123%
Number of charging point types 6 types 6 types 0%
Total number of charging points 4753 4753 0%
Total expenditure (£) 8,195,000 8,195,000 0%
Average number of EVs charged by a single charging point 35.79 63.11 76%
Average operating hours of charging points (h) 7.57 10.69 41%