TABLE 2.
m=50 | m=100 | |||||||||
---|---|---|---|---|---|---|---|---|---|---|
m | Method | Bias | SD | SE | CP | Bias | SD | SE | CP | |
Example 1 | SCAD | 0.014 | 0.090 | 0.113 | 98.9 | 0.008 | 0.070 | 0.078 | 97.8 | |
Oracle | 0.009 | 0.094 | 0.105 | 96.0 | 0.018 | 0.078 | 0.074 | 94.0 | ||
SCAD | 0.028 | 0.094 | 0.086 | 91.5 | 0.010 | 0.055 | 0.061 | 97.8 | ||
Oracle | 0.006 | 0.094 | 0.084 | 92.0 | 0.006 | 0.055 | 0.060 | 98.0 | ||
Example 3 | SCAD | 0.009 | 0.086 | 0.087 | 93.4 | 0.004 | 0.063 | 0.062 | 97.4 | |
Oracle | 0.004 | 0.082 | 0.087 | 95.0 | 0.002 | 0.061 | 0.062 | 98.0 | ||
SCAD | 0.005 | 0.069 | 0.089 | 97.8 | 0.019 | 0.058 | 0.062 | 94.8 | ||
Oracle | 0.004 | 0.084 | 0.086 | 96.0 | 0.004 | 0.059 | 0.061 | 94.0 | ||
SCAD | 0.006 | 0.088 | 0.085 | 92.3 | 0.008 | 0.057 | 0.060 | 93.5 | ||
Oracle | 0.009 | 0.087 | 0.085 | 93.0 | 0.006 | 0.055 | 0.060 | 96.0 |