Table 5.
Model performance parameters for predicting above-ground biomass using different vegetation indices (VIs) and raw reflectance bands for the studies conducted in the 2021 and 2022 growing seasons (model equations provided in Supplementary Table 2 ).
| Vis | R2 | AICc | BIC | R2cv | RMSEcv |
|---|---|---|---|---|---|
| MSAVI | 0.87 | 1896.01 | 1907.75 | 0.84 | 240.64 |
| OSAVI | 0.87 | 1895.28 | 1907.01 | 0.84 | 243.22 |
| RVI | 0.86 | 1904.01 | 1915.75 | 0.84 | 246.96 |
| SAVI | 0.86 | 1909.57 | 1921.31 | 0.83 | 251.34 |
| EVI | 0.84 | 1924.82 | 1936.56 | 0.82 | 260.19 |
| EVI2 | 0.84 | 1924.57 | 1936.30 | 0.82 | 260.26 |
| WDRVI | 0.86 | 1906.92 | 1918.66 | 0.81 | 263.85 |
| NIR | 0.82 | 1910.56 | 1922.24 | 0.79 | 267.15 |
| NDVI | 0.85 | 1917.75 | 1929.48 | 0.79 | 278.17 |
| NDRE | 0.85 | 1915.79 | 1927.53 | 0.79 | 280.39 |
| VARI | 0.80 | 1958.09 | 1969.83 | 0.78 | 284.61 |
| RECI | 0.84 | 1925.15 | 1936.89 | 0.78 | 286.98 |
| GRVI | 0.80 | 1962.05 | 1973.78 | 0.77 | 290.94 |
| SCCCI | 0.84 | 1928.49 | 1940.23 | 0.77 | 293.92 |
| NIR/G | 0.87 | 1896.81 | 1908.55 | 0.76 | 295.95 |
| RE/R | 0.82 | 1939.01 | 1950.75 | 0.76 | 300.85 |
| RED | 0.82 | 1903.43 | 1915.11 | 0.70 | 303.97 |
| GNDVI | 0.86 | 1910.01 | 1921.75 | 0.75 | 305.15 |
| TCARI | 0.82 | 1942.01 | 1953.75 | 0.70 | 330.58 |
| TCARI/OSAVI | 0.82 | 1944.09 | 1955.83 | 0.70 | 333.46 |
| RGBVI | 0.78 | 1971.23 | 1982.97 | 0.69 | 339.64 |
| BLUE | 0.78 | 1935.68 | 1947.36 | 0.62 | 344.66 |
| REDEDGE | 0.77 | 1943.90 | 1955.58 | 0.61 | 348.08 |
| GREEN | 0.78 | 1938.76 | 1950.44 | 0.56 | 362.22 |
| ExG | 0.69 | 2022.66 | 2034.39 | 0.56 | 405.25 |
R2, AICc, and BIC represent the generalized coefficient of determination, Akaike Information Criterion and Bayesian Information Criterion values, respectively, for the training data (N = 147). R2cv and RMSEcv represent the coefficient of determination and root mean sum square error, respectively, for cross-validation (N = 100).