Skip to main content
. Author manuscript; available in PMC: 2024 Nov 20.
Published in final edited form as: Sci Total Environ. 2023 Jul 25;900:165781. doi: 10.1016/j.scitotenv.2023.165781

Fig. 16.

Fig. 16.

10-Day lead time prediction. Mean-square errors and coefficient of determination (R2) computed by using the n highest ranked predictor variables in RF regression. These results were obtained using leave-one-out-cross-validation (LOOCV) scheme using RF model.