Skip to main content
. 2023 Aug 28;9(9):e19473. doi: 10.1016/j.heliyon.2023.e19473

Table 2.

Comparison of Pt ratio (predicted and test).

Mass flow rate (kg/s)
Pt Ratio
Error (%)
Inflow Outflow 1 Outflow 2 Predicted Result Test Result
0.46 −0.18 −0.27 0.98 0.98 0
0.68 −0.23 −0.45 0.96 0.96 0
0.83 −0.36 −0.47 0.94 0.95 0.553
0.82 −0.40 −0.42 0.94 0.95 1.030
0.84 −0.49 −0.34 0.93 0.95 2.105
0.96 −0.64 −0.42 0.91 0.94 3.192