Skip to main content
. 2023 Aug 29;9(9):e19488. doi: 10.1016/j.heliyon.2023.e19488

Table 5.

Completion of retting period for different conditions.

Retting condition Sample code Status of retted samples for different observation day
09 12 15 18 21
Concrete Tank 1 (Without natural catalyst) A A1 (Partial) A2 (Partial) A3 (Partial) A4 (Completed) A5 (Over)
Concrete Tank 2 (2.5% natural catalyst) B B1 (Partial) B2 (Partial) B3 (Completed) B4 (Over) B5 (Over)
Concrete Tank 3 (5% natural catalyst) C C1 (Partial) C2 (Completed) C3 (Over) C4 (Over) C5 (Over)
Concrete Tank 4 (7.5% natural catalyst) D D1 (Completed) D2 (Over) D3 (Over) D4 (Over) D5 (Over)
Existing method (Without catalyst) E E1 (Partial) E2 (Partial) E3 (Partial) E4 (Partial) E5 (Completed)