Table 2.

Core activities and resources required for pilot pick analysis.

Sl. No Core activities Time taken in minutes Human resources Materials required Total Cost
Human Resource INR (USD) Materials INR (USD)
1 Waste collection: 120 5 (Field staff)a Large waste bin bags, rubber bands, gloves, face mask 3000 (36.5) 2785 (33.9)
2 Transportation to segregation site: 30 1 (Driver) Vehicle with storage space 8120 (98.94)
3 Weighing of waste 30 3 (Field staff)a Weighing machine 3200 (38.99)
4 Segregation of waste into fractions & their weighing: 150 5 (Field staff)a Protective Gears: Gloves,
Face shield, Boots, Apron, Head cover; Dustbins, Land space (segregation site)#
1800 (21.9) 5780 (70.47)
Total 330 8 personnela 4800 (58.4) 19885 (242.1)
Total cost: 24685 (300.5)
a

Each may be involved in multiple core activities. To complete all the core activities, eight personnel are required. # Land provided by the ULB, so cost for the land not included.