Table 2.
Core activities and resources required for pilot pick analysis.
| Sl. No | Core activities | Time taken in minutes | Human resources | Materials required | Total Cost | |
| Human Resource INR (USD) | Materials INR (USD) | |||||
| 1 | Waste collection: | 120 | 5 (Field staff)a | Large waste bin bags, rubber bands, gloves, face mask | 3000 (36.5) | 2785 (33.9) |
| 2 | Transportation to segregation site: | 30 | 1 (Driver) | Vehicle with storage space | – | 8120 (98.94) |
| 3 | Weighing of waste | 30 | 3 (Field staff)a | Weighing machine | – | 3200 (38.99) |
| 4 | Segregation of waste into fractions & their weighing: | 150 | 5 (Field staff)a | Protective Gears: Gloves, Face shield, Boots, Apron, Head cover; Dustbins, Land space (segregation site)# |
1800 (21.9) | 5780 (70.47) |
| Total | 330 | 8 personnela | – | 4800 (58.4) | 19885 (242.1) | |
| Total cost: 24685 (300.5) | ||||||
Each may be involved in multiple core activities. To complete all the core activities, eight personnel are required. # Land provided by the ULB, so cost for the land not included.