Estimated cost and payback period of the 120-kW thermoelectric generation system87

Nameplate capacity (kW)
120
Note
Operating hours (h) 8,000
System establishment cost A. Equipment price (US$) 400,000
B. Expected subsidy (US$) 134,000 Government subsidy covers one-third of the implementation costs
C. Installation cost (US$) 16,700
D. Cost without subsidy (US$) 416,700 A + C
E. Cost with subsidy (US$) 282,700 A + C-B
Maintenance cost F. System maintenance (US$/y) 3,400 Mainly electrical control components
Energy conservation Annual generation (kW) 960,000
Electricity price (US$/kW) 0.08
G. Electricity cost saved per year (US$) 80,000
H. Net savings after deducting system maintenance cost (US$) 76,600 G-F
Payback period Cost without subsidy divided by cost saved (year) 5.44 D/H
Cost with subsidy divided by cost saved (year) 3.70 E/H