Skip to main content
. 2023 Oct 8;63(20):6183–6191. doi: 10.1021/acs.jcim.3c01153

Figure 1.

Figure 1

Common workflow in AmberTools. Flow went from top to bottom. Black boxes are for preparation, gray indicates an optional preparation step specific for membrane systems, blue for simulation, and red for analysis.