Skip to main content
. 2023 Jun 8;278(6):e1232–e1241. doi: 10.1097/SLA.0000000000005928

FIGURE 2.

FIGURE 2

Feasibility learning curve of operative time for RPD. A and B, The x axis indicates groups of 10 consecutive RPDs ranked from first to last per center, and the y axis indicates the operative time in SDs from the mean. B, The black line indicates CUSUM analysis of operative time. The label (n=15) indicates the first top turning point of the learning curve, where after, a continuous downward slope occurs.