Skip to main content
. 2023 Aug 19;51(12):2873–2882. doi: 10.1007/s10439-023-03349-0

Table 2.

Combination of the NMES parameters tested

Test Frequency (Hz) Plateau (on) time (s) RUD-time (s) Total on time (s) Off time (s) Duty cycle
1 1 2 1 4 8 1:2
2 1 4 0 4 8 1:2
3 36 2 1 4 8 1:2
4 36 4 0 4 8 1:2
5 36 4 0 4 4 1:1
6 36 4 0 4 12 1:3
7 36 4 0 4 16 1:4
8 36 6 0 6 12 1:2
9 36 1.5 0 1.5 3 1:2
10 66 2 1 4 8 1:2
11 66 4 0 4 8 1:2

RUD-time ramp-up/ramp-down time, Hz hertz