Skip to main content
. 2023 Oct 3;24(11):e14170. doi: 10.1002/acm2.14170

FIGURE 7.

FIGURE 7

The difference between selected plan and gold standard plan. On the top row, the percentage of cases the gold standard was selected, a larger or smaller plan compared to the gold standard plan. On the bottom row, 5 mm bin size histogram of the selected plans categorized on HD95 between CTV selected plan and gold standard plan. Negative values indicate a plan which was based on an more empty bladder than gold standard plan. Value of zero indicate that gold standard plan was selected. A positive value indicates a plan based on a fuller bladder than gold standard plan. The colors indicate the three different image types, XVI CBCT, iCBCT, and sCT.