Skip to main content
. 2023 Oct 30;9(11):e21409. doi: 10.1016/j.heliyon.2023.e21409

Table 2.

Optional equipment parameters.

Equipment Investment cost (yuan/kW) Operation and maintenance cost (yuan/kW) Life cycle (year) Efficiency (−)
CHP 7900 0.06 20 ηchpe = 0.3
ηchph = 0.173
GB 400 0.04 30 0.94
EB 1000 0.32 25 0.95
AC 1100 0.08 20 1.3
EC 970 0.097 10 3.5
PV 8000 0.01 20
ES 3000 0.0125 20 0.98
HS 320 2.43 20 0.92
CS 320 2.43 25 0.92