Table 5.
Planning results.
| Equipment | Scenario 1 | Scenario 2 | |
|---|---|---|---|
| Equipment power configuration (kW) | CHP | 450 | 256 |
| GB | 843 | 1250 | |
| EB | 0 | 0 | |
| AC | 860 | 456 | |
| EC | 520 | 600 | |
| PV | 3000 | 3000 | |
| ES | 800 | 1000 | |
| HS | 2500 | 1800 | |
| CS | 2500 | 1800 | |
| Cost (million yuan) | Annual investment cost | 30.468 | 28.361 |
| Annual operation and maintenance cost | 18.634 | 26.328 |