Skip to main content
. 2023 Jul 26;3(6):336–341. doi: 10.1021/acsenvironau.3c00023

Figure 2.

Figure 2

(A) Desorption of 6PPD-quinone from 20 g/L crushed loose (loose particles, ∼5 cm) rubberized asphalt mixtures to solution-phase during 12 days of experimentation. RMM1, RMM2, and RMM3 represent the different crushed loose rubberized asphalt mixtures. (B) Desorption of 6PPD-quinone from rubberized compacted asphalt mixtures. Error bars represent standard deviation derived from duplicate experiments.