Floor and ceiling effects in PROMIS and legacy instruments

Author N Procedure PROMIS domain Timepoint Floor (%) Ceiling (%)
Khalil et al. [19] 875 TKA PROMIS GPH NR 0 0
Austin et al. [21] 217 TKA PROMIS GPH Preoperative  < 0.1 0
PROMIS GPH (1–90 days) 0  < 0.1
PROMIS GPH (270–365 days) 0 1.60
PROMIS GMH Preoperative  < 0.1 5.60
PROMIS GMH (1–90 days)  < 0.1 6.20
PROMIS GMH (270–265 days) 0 7.20
KOOS-JR Preoperative 1 0.20
KOOS-JR (1–90 days)  < 0.1 0.90
KOOS-JR (270–265 days) 1 4.80
M-SANE Preoperative 4 1.00
M-SANE (1–90 days) 0 0.90
M-SANE (270–265 days) 0 11.30
Lawrie et al. [31] 172 TKA, BPCI PROMIS PF Preoperative 0 0
PROMIS PF 12 months 0 0
PROMIS PI Preoperative 0 0
PROMIS PI 12 months 20 0
Depression Preoperative 13 0
Depression 12 months 38 0
TKA, non-BPCI PROMIS PF Preoperative 0 0
PROMIS PF 12 months 0 0.50
PROMIS PI Preoperative 0 0
PROMIS PI 12 months 14 0
Depression Preoperative 21 0
Depression 12 months 38 0