Skip to main content
. 2023 Aug 24;24(12):e14134. doi: 10.1002/acm2.14134

FIGURE 2.

FIGURE 2

SIB initial plan dosimetric evaluation. Distributions of (a) PTV (b) OAR dose differences between achieved values and institutional guidelines for Ethos (blue) and clinical (green) initial plans. The shaded areas indicate that a goal was not met. *Statistically significant difference (p < 0.05).